Bloors Lane, Rainham, Kent

Remove existing trees and dispose off site.

Strip all vegetation/turf and dispose off site.

Reduce level dig and dispose of spoils off site.

Trim and compact bottom of excavation.

Supply and lay of Permeable Geotextile Membrane.

Supply and lay Type 3 (Reduced Fines) aggregate to working area 300mm deep, including trim and compact to new falls and levels.

Supply and lay new kerbs on concrete bed and haunched to suit new levels and falls.

Supply and lay Brett Landscaping block paving to perimeter of building to provide new footpath, brushed in with Kiln Dried Sand.

Supply and lay Golpla Reinforcement Grids on 2/6mm aggregate, infilled with 20mm Granite Chippings.

Installation of new block paved rumble strip to entrance.

Installation of lighting bollards to perimeter of car park.