Ethelbert Road, Canterbury, Kent
Remove existing paving and dispose off site.
Reduce level dig and install Type 1 aggregate, timber formwork, reinforcement mesh and pour concrete base for air compressor unit. Before returning once cured to strike timber formwork.
Regulate existing Type 1 subbase below previous paving. Supply and install Round Top Concrete Bollards. Finish with asphalt to new footpath area.