Ethelbert Road, Canterbury, Kent

Remove existing paving and dispose off site.

Reduce level dig and install Type 1 aggregate, timber formwork, reinforcement mesh and pour concrete base for air compressor unit. Before returning once cured to strike timber formwork.

Regulate existing Type 1 subbase below previous paving. Supply and install Round Top Concrete Bollards. Finish with asphalt to new footpath area.

logo logo logo logo logo logo logo logo logo