Wharf Road, Gravesend, Kent
Reduce level dig and dispose of spoils off site.
Installation of new surface water drainage to areas.
Trim and compact bottom of excavation.
Supply and lay Geotextile Membrane.
Supply and lay Tensar Geogrid.
Supply and lay of Type 1 Aggregate, including trim and compact to new falls and levels.
Supply and lay of K-Form Permanent Shuttering.
Supply and lay Steel Reinforcement Mesh.
Supply and lay PAV2 Concrete with brush finish and arris trowel edges.
All gullies fitted with D400 cover and frames.
Polysulphide mastic was then applied to all K-Form joints once concrete had cured.
Works were completed during a live working environment and we had to ensure we provided as minimal disruption as possible.